Privacy and terms of service
(JP¥1,700)
+HK$93.99 Shipping fee
+HK$15.55 Service fee
Text is automatically translated.
Report translation issueText is automatically translated.
Report translation issueFraud prevention
Customer support
Refund support for customers
Item condition
Brand New
Ships from
Japan
Category
Seller info
na-chan*
5/5174
Bundle & Save : Our users save an average of 35% on shipping fees by bundling multiple items!
Something went wrong, please try again later.
Something went wrong, please try again later.
The construction experience descriptions I am offering were created based on my own actual work experience and types of construction. Compared to commercially available reference books, the content is almost entirely unique. I have passed the Grade 1 Plumbing Construction Management Engineer examination with the content described in ① below. The specific details are as follows: Construction Content: Propane Gas (LPG) Piping Work ① Safety Management: Accident Prevention During Oxygen Deficiency Hazard Work → For one particularly important item, Three measures or countermeasures taken Schedule Management: Changes to the Work Plan Due to Delay in Start Date → For one particularly important item, Three measures or countermeasures taken Trial Run and Adjustment: Confirmation of Stability of Supplied Gas Pressure → For one particularly important item, Three measures or countermeasures taken Self-Inspection: Confirmation of Construction Status Before Backfilling Buried Piping → For one particularly important item, Three measures or countermeasures taken Acceptance Inspection: On-site Acceptance Inspection of Various Piping Materials → Three inspection items considered particularly important Construction Content: Liquefied Gas Supply Piping Work ② Safety Management: Prevention of Crane Overturning During Lifting Operations Schedule Management: Schedule Adjustment During Outdoor Piping Welding Work Trial Run and Adjustment: Confirmation of Soundness of Flow Monitoring System Self-Inspection: Confirmation of Maintainability of Completed Supply Equipment Acceptance Inspection: On-site Acceptance Inspection of Vaporizers and Valves Construction Content: Septic Tank Installation Work ③ Safety Management: Accident Prevention Due to Collapse of Shoring Walls Schedule Management: Consultation and Schedule Adjustment with Construction Personnel Trial Run and Adjustment: Confirmation of Noise Level of Rotary Blower Self-Inspection: Confirmation of Drainage Performance within Inlet and Outlet Conduits Acceptance Inspection: On-site Acceptance Inspection of Septic Tank and Accessories Specific information such as building names and addresses has been blanked out (filled in with ●●●). The answer sheet shown in the attached photo will also be included, so please make copies for your use. Upon purchase, I will ship 8 A4 pages (the 3 experience descriptions above + the answer sheet) enclosed in a clear file and placed in an envelope. Please refrain from negotiating discounts. m(_ _)m #Grade1PlumbingConstructionManagementEngineer #Grade1Plumbing #PlumbingConstruction #ConstructionManagement #2ndExam #PracticalExam #WrittenExam #Description
8 months ago